Booking period

The last 12 months before certification. A quantity comparison of all sites contained in the system boundary must be carried out annually: It must be demonstrated that there were sufficient inputs to produce the RAP, taking into account production losses.

Booking period:

A reconciliation of RMUs entering and leaving system boundary performed on an periodic basis (e.g. 1 year): it must be shown that enough inputs were available to produce the RAP claimed from RMUs leaving the system.