Input

The total weight of the material fed to the process during a given period.

Minor discrepancy

Minor discrepancy during the audit that the certified company must rectify within 3 months. If a deviation is not corrected within 3 months to the satisfaction of the inspector, the certification should be withdrawn.

Open loop recycling

is a recycling process in which the plastic waste used is processed into both new raw materials and waste products. Typically, plastic waste that is recycled as part of open-loop recycling is used for purposes other than its previous purpose. This means that the input...